Done:
1st coat of paint
Waterproofing floor
Tiling floor
Grouting floor
Caulk, round 1
2nd coat of paint
Sanding off old trim finish (half done)
Staining trim (half done)
Cutting the door smaller (half done)
Waterproofing the shower
Tiling the Shower (Three-quarters done)
Trim
Not Done:
Sanding off old trim finish (half not done)
Staining trim (half not done)
Cutting the door smaller (half not done)
Tiling the Shower (One-quarter not done)
Grouting the shower
Caulk, round 2
Installing toilet and sink